Engineering, 12.04.2021 21:40 izearaholland7308
A hydropower facility is being planned for construction 5 miles southwest of the town of Winnemucca, Nevada. The water surface of the Lahontan Reservoir will average 75 meters above the tailrace with a riveted steel penstock 300 meters long and a diameter of 1.7 meters. With an average water temperature of 20C, the flow rate provided by the penstock is to be 16m3/s with a combined head loss in the turbine, located slightly more than 3 meters above the tailrace, and draft tube of 2.0 meters and an average velocity in the tailrace of 0.5 m/s. Your role in the planning process is to determine the effective head that will be supplied to the turbine and the amount of power that can be extracted from the system.
Answers: 1
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
Engineering, 04.07.2019 18:10
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
Engineering, 04.07.2019 18:20
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
Engineering, 04.07.2019 18:20
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
A hydropower facility is being planned for construction 5 miles southwest of the town of Winnemucca,...
Geography, 30.11.2020 08:10
Physics, 30.11.2020 08:10
Mathematics, 30.11.2020 08:10
Mathematics, 30.11.2020 08:10
Health, 30.11.2020 08:10
History, 30.11.2020 08:10
Business, 30.11.2020 08:10
English, 30.11.2020 08:10