Engineering, 22.04.2021 17:30 Geo777

Assume that the electrical subcontractor forgot to place the sleeves for a group of large conduits in a concrete deck prior to pouring concrete. The rebar subcontractor did not provide additional reinforcing because their work practice is to only add trim bars around deck penetrations physically placed on the deck. In this case the concrete deck will need to be reinforced with steel angles due to the absence of the rebar trim bars, and then the deck will be core drilled for the conduits. Which subcontractor will furnish and install the steel angles

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 15:10
If you were designing a bumper for a car, would you prefer it to exhibit elastic or plastic deformation? why? consider the functions of a bumper in both a minor "fender-bender" and a major collision.
Answers: 1
question
Engineering, 04.07.2019 18:20
Athin walled concentric tube exchanger is used to cool engine oil from 160°c to 60°c with water that is available at 25°c acting as a coolant. the oil and water flow rates are each at 2 kg/s, and the diameter of the inner tube is 0.5 m and the corresponding value of the overall heat transfer coefficient is 250 w/m2. oc. how long must the heat exchanger be to accomplish the desired cooling? cpwater=4.187 kj/kg-candcpengine el=2.035 kj/kg·°c, oil . 120]
Answers: 1
question
Engineering, 04.07.2019 18:20
Asimple rankine cycle uses water as the working fluid. the water enters the turbine at 10 mpa and 480c while the condenser operates at 6 kpa. if the turbine has an isentropic efficiency of 80 percent while the pump has an isentropic efficiency of 70 percent determine the thermal efficiency
Answers: 1
question
Engineering, 04.07.2019 19:10
Asteel wire of 2 mm diameter is fixed between two points located 2 m apart. the tensile force in the wire is 250n, if its density of steel is given by 7830 kg/m3 the fundamental frequency of vibration hz? ?
Answers: 3
You know the right answer?
Assume that the electrical subcontractor forgot to place the sleeves for a group of large conduits i...
Questions
question
Geography, 11.09.2019 17:30
Questions on the website: 13722367