subject
Engineering, 22.04.2021 21:20 rattler6125

The plasma concentration for a patient taking an oral drug is given by: Cp(t)=20 (e-0.2t - e-2t)
where t is in hours and Cp is in mg/L. Calculate the AUC2hr-12hr using the following methods:
(i) Analytical integration.
(ii) Sum of areas of rectangles-A. Plot Cplt) first. Then divide the time period in 5 equally spaced time intervals and calculate the sum of the areas of each of the rectangles having as base a given time interval and as height the value of Cp at the beginning of that time interval.
(iii) Sum of areas of rectangles-B. Same as in previous question, but use the value of Cp at the end of any given time interval.
(iv) Sum of areas of trapezoids using the same time intervals.
Briefly comment the differences among the results obtained above.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
question
Engineering, 04.07.2019 18:10
Shafts are machine elements that are used to a) carry axial loads b) direct shear loads c) transmit power d) rotate at constant speed e) none of the above circular and square shafts subjected to the same torque under the same circum behave a) the same way b) almost the same way
Answers: 2
question
Engineering, 04.07.2019 19:10
When subject to a steady load (within elastic range) over a long period of time, what is the major difference in material behavoir between steel and plastic?
Answers: 2
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
The plasma concentration for a patient taking an oral drug is given by: Cp(t)=20 (e-0.2t - e-2t) <...
Questions
question
Mathematics, 28.08.2021 01:00
question
Mathematics, 28.08.2021 01:00
question
Chemistry, 28.08.2021 01:00
question
History, 28.08.2021 01:00
Questions on the website: 13722361