subject
Engineering, 25.04.2021 08:00 veritoburito

Tamara has received multiple bids from general contractors to install a new pool in her backyard. How should she go about selecting which contractor to use? 1.She should ignore the bids and rely on online reviews from past clients.
2.She should sign with whoever bid the least amount of money.
3. She should weigh the cost of the bid with the services offered.
4. She should sign with whoever can handle the project independently without her input.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Fluids at rest possess no flow energy. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
Awall of 0.5m thickness is to be constructed from a material which has average thermal conductivity of 1.4 w/mk. the wall is to be insulated with a material having an average thermal conductivity of 0.35 w/mk so that heat loss per square meter shall not exceed 1450 w. assume inner wall surface temperature of 1200°c and outer surface temperature of the insulation to be 15°c. calculate the thickness of insulation required.
Answers: 3
question
Engineering, 04.07.2019 18:20
Acertain flow of air (at stp) has a velocity distribution given by v i (in ft/s). if this flow is going through a 4 ft square area in the yz-plane (centered at the origin), what is the mass flow rate (in lbm/s)?
Answers: 2
question
Engineering, 04.07.2019 18:20
The characteristic roots of a dynamic system are: 1.7920 1.8160 i, -1.7920 1.8160 i, -0.4160 what is the order of this system? what are the settling time and damping ratio of the system?
Answers: 3
You know the right answer?
Tamara has received multiple bids from general contractors to install a new pool in her backyard. Ho...
Questions
question
Mathematics, 23.07.2019 01:30
Questions on the website: 13722361