Need fast 30 pointsProject: Researching Materials, Time, and Cost for Product Modifications Assignment Directions

When a client approaches an engineer about a project, the engineer might not have all of the information available to create a bid proposal. The engineer might need to research time, cost, and materials needed to complete the project. Take a moment to think of an everyday object. It could be a stapler, a fork, or even a shoe. You must choose two of the three analyses (time, cost, or materials) to research for your chosen object. Once you have completed the research, you will present the documentation and explain your findings in a script for a 3- to 5-minute oral presentation. Remember that a bid proposal is intended to persuade a client to use your services, so be sure to use persuasive techniques to convince your audience to choose your bid proposal.

Assignment Guidelines

Each script for a 3- to 5-minute presentation must include two of the following:

cost analysis
materials analysis
time analysis
Each analysis must include graphic representation.

Submission Requirements

One to two pages double spaced

Proper grammar and vocabulary

Question # 1

File Upload
Upload your presentation that demonstrates your analyses from your research on time, cost, and/or materials for your object (choose two).

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Consider a large isothermal enclosure that is maintained at a uniform temperature of 2000 k. calculate the emissive power of the radiation that emerges from a small aperture on the enclosure surface. what is the wavelength ? , below which 10% of the emission is concentrated? what is the wavelength ? 2 above which 10% of the emission is concentrated? determine the wavelength at which maximum spectral emissive power occurs. what is the irradiation incident on a small object placed inside the enclosure?
Answers: 2
question
Engineering, 04.07.2019 18:10
Ahot wire operates at a temperature of 200°c while the air temperature is 20°c. the hot wire element is a tungsten wire of 5 um diameter and 2 mm in length. plot using excel current, heat transfer and heat generated by the wire for air velocity varying from 1-10 m/s in steps of lm/s? matlab the sensor voltage output, resistance, or assume nu 0.989 re033pr13 take air properties at tr (200°c20°c)/2 = 110°c properties of tungsten: c 0.13 kj/kg.k 3 p 19250 kg/m k (thermal conductivity) = 174 w/m.k
Answers: 2
question
Engineering, 04.07.2019 18:10
An air compression refrigeration system is to have an air pressure of 100 psia in the brine tank and an allowable air temperature increase of 60°f for standard vapor compression cycle temperatures of 77 f entering the expansion cylinder and 14 f entering the compression cylinder, calculate the coefficient of performance a. 2.5 b 3.3 c. 4.0 d. 5.0
Answers: 3
question
Engineering, 04.07.2019 18:20
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
You know the right answer?
Need fast 30 pointsProject: Researching Materials, Time, and Cost for Product Modifications Assign...
Questions
question
Social Studies, 09.12.2020 22:10
question
Mathematics, 09.12.2020 22:10
question
Mathematics, 09.12.2020 22:10
question
English, 09.12.2020 22:10
question
Mathematics, 09.12.2020 22:10
question
Mathematics, 09.12.2020 22:10
Questions on the website: 13722359