subject
Engineering, 13.05.2021 14:00 cathydaves

Peter Reyes, a marketing surveyor, found out that it takes a total of 151 minutes for 10 persons to complete a particular questionnaire he made. He applied a performance rating of 115% and there is an allowance of 23% added to the normal time. What is the standard time for this particular job?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Ahot wire operates at a temperature of 200°c while the air temperature is 20°c. the hot wire element is a tungsten wire of 5 um diameter and 2 mm in length. plot using excel current, heat transfer and heat generated by the wire for air velocity varying from 1-10 m/s in steps of lm/s? matlab the sensor voltage output, resistance, or assume nu 0.989 re033pr13 take air properties at tr (200°c20°c)/2 = 110°c properties of tungsten: c 0.13 kj/kg.k 3 p 19250 kg/m k (thermal conductivity) = 174 w/m.k
Answers: 2
question
Engineering, 04.07.2019 18:20
Find the kinematic pressure of 160kpa. for air, r-287 j/ kg k. and hair al viscosity of air at a temperature of 50°c and an absolute (10 points) (b) find the dynamic viscosity of air at 110 °c. sutherland constant for air is 111k
Answers: 3
question
Engineering, 04.07.2019 18:20
An engine runs on the ideal diesel cycle. the cycle has a compression ratio of 20 and a cutoff ratio of 2. the highest temperature in the cycle is 1200 k. if the heat into the system is 300 kj/kg of working fluid and using variable specific heats determine the work produced per mass of working fluid
Answers: 3
question
Engineering, 04.07.2019 18:20
How much power could a wind turbine produce if it had the following specifications? cp = 0.45 -d=1.2kg/m3 d=50m v 5m/s
Answers: 2
You know the right answer?
Peter Reyes, a marketing surveyor, found out that it takes a total of 151 minutes for 10 persons to...
Questions
question
Mathematics, 01.09.2019 11:00
question
History, 01.09.2019 11:10
question
Chemistry, 01.09.2019 11:10
Questions on the website: 13722359