subject
Engineering, 13.05.2021 19:30 mustafaserang582

g You are responsible for design and construction of a new freeway. Estimated flow rate for the freeway is each direction in design hour is 7500 vph. The deigned freeway should meet the following conditions: a) It should operate at level of service of B or higher during the design hour and A for the rest of the times. b) The base free flow speed for the freeway is 75 mph and free flow speed should not fall below 70 mph. c) Due to topography constraints, the widths of the cross section cannot exceed 200 ft. d) On average, number of access points to the freeway 2 per mile. What is your recommended design for this section of the freeway

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Steel is coated with a thin layer of ceramic to protect against corrosion. what do you expect to happen to the coating when the temperature of the steel is increased significantly? explain.
Answers: 1
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following ziegler nichols tuning methods the response of the controller to a step input should exhibit an s-shaped curve? a)-open loop mode b)-closed loop mode c)-both modes (open & closed) d)-none of the modes (open & closed)
Answers: 3
question
Engineering, 04.07.2019 18:10
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
You know the right answer?
g You are responsible for design and construction of a new freeway. Estimated flow rate for the free...
Questions
question
Mathematics, 11.02.2022 14:00
question
Mathematics, 11.02.2022 14:00
question
Mathematics, 11.02.2022 14:00
Questions on the website: 13722367