A new development is being proposed over a 10 acres site. The developer wants to divide the site into 40 lots and have a single-family home at each lot. Each home will take about 40 percent of the lot size. 30% of the lot will be landscaped with shrubs, the rest of the lot will be lawns and sidewalks. After finishing developing the site, the first rainfall of the season hits the development. The rainfall lasted for 3 hours with an average of 0.51 in/hr. Geotechnical report prepared as part of the city permit requirement showed that the initial infiltration was 0.32 in/hr, the final was 0.15in/hr, and decay constant was 0.1 Shr-1. Some residents complained that there was water accumulated at their properties cause some damages. Residents threatened to take legal action against the developer. The developer hired your company to investigate what had happen. You are assigned to the project and been asked by your supervisor to perform the following calculations: 1. What is the interception?
2. What is the infiltration?
3. In your opinion and based on your analysis do you believe that the residents allegations are founded?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Steel is coated with a thin layer of ceramic to protect against corrosion. what do you expect to happen to the coating when the temperature of the steel is increased significantly? explain.
Answers: 1
question
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
question
Engineering, 04.07.2019 18:10
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
You know the right answer?
A new development is being proposed over a 10 acres site. The developer wants to divide the site int...