Engineering, 27.05.2021 08:40 gabrielmartinsotr4yl

For a commercial steel building construction project, (at least eight steps). You have created a work breakdown structure, as follows:  Prepare the site (3 days), and then set the building footers (4 days).  Finish the foundation, and then assemble the building (your student ID second last digit days, if zero, then 4 days).  When the building is assembled, start two tasks at once: finish the interior work (5 days) and set up an appointment for the final building inspection (15 days).  When the interior work is done, start two more tasks at once: landscaping (10 days) and driveway paving (3 days).  When the landscaping and driveway are done, do the painting (2 days).  Finally, when the painting is done and the final inspection has occurred, arrange the sale (2 days).

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 18:10
Which from the following instrument is commonly used to detect the high pitch butzing sound in bearings? [clo4] a)-digital ultrasonic meter b)-infrared camera c)-spectroscopic d)-vibrometer
Answers: 2
question
Engineering, 04.07.2019 18:20
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
question
Engineering, 04.07.2019 18:20
Find the kinematic pressure of 160kpa. for air, r-287 j/ kg k. and hair al viscosity of air at a temperature of 50°c and an absolute (10 points) (b) find the dynamic viscosity of air at 110 °c. sutherland constant for air is 111k
Answers: 3
You know the right answer?
For a commercial steel building construction project, (at least eight steps). You have created a wor...
Questions
Questions on the website: 13722367