subject
Engineering, 08.06.2021 09:00 dari122223

Vehicles begin to arrive at a park entrance at 7:45 A. M. at a constant rate of six per minute and at a constant rate of four vehicles per minute from 8:00 A. M. on. The park opens at 8:00 A. M. and the manager wants to set the departure rate so that the average delay per vehicle is no greater than 9 minutes (measured from the time of the first arrival until the total queue clears). Assuming D/D/1 queuing, what is the minimum departure rate needed to achieve this?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 18:10
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
question
Engineering, 04.07.2019 18:20
Derive the correction factor formula for conical nozzle i=-(1+ cosa) and calculate the nozzle angle correction factor for a nozzle whose divergence hal-fangle is 13 (hint: assume that all the mass flow originates at the apex of the cone.
Answers: 3
question
Engineering, 04.07.2019 19:10
How to increase the thermal officiency of an ideal simple rankino cycle? among these methods, which one is the best and why?
Answers: 2
You know the right answer?
Vehicles begin to arrive at a park entrance at 7:45 A. M. at a constant rate of six per minute and a...
Questions
question
History, 20.10.2019 14:30
question
Mathematics, 20.10.2019 14:30
question
Social Studies, 20.10.2019 14:30
Questions on the website: 13722361