subject
Engineering, 10.06.2021 15:20 tylermdons

Problem 1: We need to build up to 6 power plants (L1 to L6) to serve 7 communities (C1 to C7). The cost to build a power plant is 6.5 million (AED). The maximum capacity of each plant is 11 million watts. The demand of each community is given below: Community 1 2 3 4 5 6 7 Demand in millions watt 3 4 6 4 5 2 4 The benefits (in $/watt but sometimes it is a loss) from serving the community is given below: Location C1 C2 C3 C4 C5 C6 C7 L1 4 4.5 2.5 1.5 3.5 4.2 -0.5 L2 4 4.5 2.5 0.5 1 0.5 -3.5 L3 3.5 5 4 1.5 4.5 3.5 0 L4 1.3 3 5 1.8 5.5 3.3 1.3 L5 0.5 1 1.5 5.5 4 5 3 L6 -1 0 1.5 4.5 4 3.3 2 Find which power plants should be built:

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 18:10
Shafts are machine elements that are used to a) carry axial loads b) direct shear loads c) transmit power d) rotate at constant speed e) none of the above circular and square shafts subjected to the same torque under the same circum behave a) the same way b) almost the same way
Answers: 2
question
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:20
Amixture of slurry and mud is to be pumped through a horizontal pipe of diameter 500 mm. the fluid behaves as a bingham plastic with a yield stress of 30 pa and viscosity 0.04 pa.s. describe the effects of the shear stress through a transverse section of the pipe by plotting the variation in shear stress and velocity profile: (i) just before the slurry starts to move (ii) as the slurry flows when the pressure gradient is double that in part (i)
Answers: 3
You know the right answer?
Problem 1: We need to build up to 6 power plants (L1 to L6) to serve 7 communities (C1 to C7). The c...
Questions
Questions on the website: 13722367