subject
Engineering, 15.06.2021 21:50 Amandarobersonn

If possible, then please help me with this question. I'll be so grateful to you. Imagine a situation where your laptop is almost out of charge. To charge up your laptop, you have to use the wall socket, which provides a sinusoidal AC output of 127 V (rms) and 50 Hz, but your laptop needs to receive a DC voltage of 20.4 V to be charged. However, the connection from the wall socket can be a bit unstable as sometimes it spikes to a much higher than the rated value.
To address the above issue, illustrate a diode-based circuit that can be placed between the wall socket and your laptop to charge your laptop successfully and safely.

Design Criteria:
1) The regular diodes (choose between Ge, Si, GaAs), zener diode, and resistors can be used to construct the circuit.
2) The PIV of the diode must exceed the peak value of the AC input.
3) An overcharge protection must be implemented to keep your laptop from being damaged from spikes in the voltage.

Based on this criterion, demonstrate the following:
i) Identify the name of the circuit and illustrate the designed circuit with appropriate connections and adequate labeling. Also, explain the operation of the designed circuit.
ii) Show the appropriate label of the input and output voltage wave shapes of the designed circuit.


If possible, then please help me with this question. I'll be so grateful to you.

Imagine a situat

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:10
Aflywheel accelerates for 5 seconds at 2 rad/s2 from a speed of 20 rpm. determine the total number of revolutions of the flywheel during the period of its acceleration. a.5.65 b.8.43 c. 723 d.6.86
Answers: 2
question
Engineering, 04.07.2019 18:10
Machinery that is a key part of the process and without which the plant or process cannot function is classifed as: (clo4) a)-critical machinery b)-essential machinery c)-general purpose machinery d)-none of the specified options.
Answers: 1
question
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
You know the right answer?
If possible, then please help me with this question. I'll be so grateful to you. Imagine a situatio...
Questions
question
Health, 06.12.2021 17:50
question
Mathematics, 06.12.2021 17:50
question
Mathematics, 06.12.2021 17:50
Questions on the website: 13722363