![subject](/tpl/images/cats/User.png)
Engineering, 17.06.2021 21:00 lindsaypre0644
Consider the same piping system. this time, the same pipe is buried underground. assuming that there is a constant heat flux of 100w/m^2 from the outer surfance of the pipe to the soil determine the exit temperature of the water.
a. 129.1
b. 111.1
c. 82.1
d. 68.1
![ansver](/tpl/images/cats/User.png)
Answers: 3
Another question on Engineering
![question](/tpl/images/cats/User.png)
Engineering, 04.07.2019 18:20
Atank with constant volume contains 2.27 kg of a mixture of water phases (liquid-vapor). in the initial state the temperature and the quality are 127 °c and 0.6, respectively. the mixture is heated until the temperature of 160 oc is reached. illustrate the process in a t-v diagram. then, determine (1) the mass of the vapor in kg at the initial state, (2) the final pressure in kpa.
Answers: 3
![question](/tpl/images/cats/User.png)
Engineering, 04.07.2019 18:20
For each of the following process: a) sketch the p-v diagram, b)sketch t-s diagram, c) sketch t-v diagram, d) sketch the boundary work on one of the diagrams (a, b or c) and e) sketch the reversible heat transfer on one of the diagrams (a, b or c): 1- isobaric process from compressed liquid to superheated vapor 2- isothermal process from compressed liquid to superheated vapor 3- isentropic process from compressed liquid to superheated vapor
Answers: 3
![question](/tpl/images/cats/User.png)
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
![question](/tpl/images/cats/User.png)
Engineering, 04.07.2019 19:20
The process in which the system pressure remain constant is called a)-isobaric b)-isochoric c)-isolated d)-isothermal
Answers: 3
You know the right answer?
Consider the same piping system. this time, the same pipe is buried underground. assuming that there...
Questions
![question](/tpl/images/cats/mat.png)
![question](/tpl/images/cats/fizika.png)
![question](/tpl/images/cats/mkx.png)
![question](/tpl/images/cats/mat.png)
Mathematics, 12.10.2020 06:01
![question](/tpl/images/cats/istoriya.png)
History, 12.10.2020 06:01
![question](/tpl/images/cats/himiya.png)
![question](/tpl/images/cats/health.png)
Health, 12.10.2020 06:01
![question](/tpl/images/cats/obshestvoznanie.png)
Social Studies, 12.10.2020 06:01
![question](/tpl/images/cats/mat.png)
Mathematics, 12.10.2020 06:01
![question](/tpl/images/cats/istoriya.png)
History, 12.10.2020 06:01
![question](/tpl/images/cats/himiya.png)
Chemistry, 12.10.2020 06:01
![question](/tpl/images/cats/fr.png)
French, 12.10.2020 06:01
![question](/tpl/images/cats/mat.png)
![question](/tpl/images/cats/en.png)
![question](/tpl/images/cats/en.png)
English, 12.10.2020 06:01
![question](/tpl/images/cats/mat.png)
![question](/tpl/images/cats/mat.png)
Mathematics, 12.10.2020 06:01
![question](/tpl/images/cats/mir.png)
![question](/tpl/images/cats/en.png)