Engineering, 21.06.2021 08:00 bmharris8262
Direction read and analyze each question carefully choose your answer in the box below write your answer on the blank space before each number.
Plumb, Orientation ,Line, Dimension, Equipment, Chalk line
1. It is any measurable extent or magnitude, as to length, breadth or thickness?
2.It is used for making straight line on a long piece of lumber or wood?
3.It is a line representing one side of the building to be erected?
4.This is perpendicular to a horizontal line?
5.The set of articles or physical resources serving to equip a person or thing such as the implement used in an operation or activity?
Answers: 1
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
Engineering, 04.07.2019 18:10
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
Direction read and analyze each question carefully choose your answer in the box below write your an...
Mathematics, 08.12.2020 16:40
Business, 08.12.2020 16:40
Chemistry, 08.12.2020 16:40
Mathematics, 08.12.2020 16:40
Social Studies, 08.12.2020 16:40
Mathematics, 08.12.2020 16:40
Mathematics, 08.12.2020 16:40
Mathematics, 08.12.2020 16:40
Mathematics, 08.12.2020 16:40
Computers and Technology, 08.12.2020 16:40