subject
Engineering, 21.06.2021 08:00 bmharris8262

Direction read and analyze each question carefully choose your answer in the box below write your answer on the blank space before each number. ​Plumb, Orientation ,Line, Dimension, Equipment, Chalk line

1. It is any measurable extent or magnitude, as to length, breadth or thickness?

2.It is used for making straight line on a long piece of lumber or wood?

3.It is a line representing one side of the building to be erected?

4.This is perpendicular to a horizontal line?

5.The set of articles or physical resources serving to equip a person or thing such as the implement used in an operation or activity?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
question
Engineering, 04.07.2019 18:10
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
question
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
You know the right answer?
Direction read and analyze each question carefully choose your answer in the box below write your an...
Questions
question
Mathematics, 08.12.2020 16:40
question
Business, 08.12.2020 16:40
question
Chemistry, 08.12.2020 16:40
question
Mathematics, 08.12.2020 16:40
question
Social Studies, 08.12.2020 16:40
question
Mathematics, 08.12.2020 16:40
question
Mathematics, 08.12.2020 16:40
question
Mathematics, 08.12.2020 16:40
Questions on the website: 13722360