You are in charge of a large assembly shop. One of your customers has promised to award you a large contract for the assembly of 1000 units of a new product. The suggested bid price is based on an average of 20 hours of direct labor per unit. You conduct a couple test assemblies and find that, the first unit took 50 hours and the second unit completed in just 45 hours. How many hours do you expect the assembly of the first hundred units and the second 100 units to take? Is the contractor’s assumption about the average labor hours per unit valid or should the price be revised?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
question
Engineering, 04.07.2019 18:10
Which from the following instrument is commonly used to detect the high pitch butzing sound in bearings? [clo4] a)-digital ultrasonic meter b)-infrared camera c)-spectroscopic d)-vibrometer
Answers: 2
question
Engineering, 04.07.2019 19:10
For a process taking place in a closed system containing gas, the volume and pressure relationship is pvi-constant. -1.5 bar, the process starts with initial conditions, pi = =0.03 m3 and ends with final volume, v2-0.05 m3 determine the work done by the gas.
Answers: 2
You know the right answer?
You are in charge of a large assembly shop. One of your customers has promised to award you a large...
Questions
question
Mathematics, 10.05.2021 18:40
Questions on the website: 13722360