subject
Engineering, 30.08.2021 08:40 laurentsupreme

An installation consists of a 10-kVA, single-phase transformer with a 440-volt primary and a 110-volt, 2-wire secondary using THWN copper conductors. No secondary OCPD is installed. The secondary loads are considered to be noncontinuous loads. Calculate the minimum size secondary conductors required to handle the secondary full-load current for this transformer. (Assume terminations are rated for 75°C.)

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Find the minimum film thickness for a journal bearing with the data below. shaft diameter, d-50 mm, clearance ratio, cdratio? 0.001, shaft speed, n 2000 rpm; bearing length. i 200 mm; eccentricity ration, ? -0.55. ( note, cdratio-ca/d) the minimum film thickness is um
Answers: 2
question
Engineering, 04.07.2019 18:20
For each of the following process: a) sketch the p-v diagram, b)sketch t-s diagram, c) sketch t-v diagram, d) sketch the boundary work on one of the diagrams (a, b or c) and e) sketch the reversible heat transfer on one of the diagrams (a, b or c): 1- isobaric process from compressed liquid to superheated vapor 2- isothermal process from compressed liquid to superheated vapor 3- isentropic process from compressed liquid to superheated vapor
Answers: 3
question
Engineering, 04.07.2019 19:10
What are the major differences between injection molding and extrusion?
Answers: 2
question
Engineering, 04.07.2019 19:10
In general, how do thermosetting plastics compare to thermoplastics in mechanical and physical properties?
Answers: 3
You know the right answer?
An installation consists of a 10-kVA, single-phase transformer with a 440-volt primary and a 110-vol...
Questions
question
English, 30.06.2019 00:30
question
Chemistry, 30.06.2019 00:30
question
Mathematics, 30.06.2019 00:30
question
Mathematics, 30.06.2019 00:30
question
Mathematics, 30.06.2019 00:30
Questions on the website: 13722362