A drainpipe 30 cm diameter lies beneath an earth dam. The pipe was partially clogged with sand. The discharge of the pipe was 300 lit/day when the difference between the dam's upstream and downstream water levels was 20 m. Calculate the clogged length, if the permeability of the sand was estimated to be 0.01 cm/sec.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Afour cylinder four-stroke in-line engine has a stroke of 160mm, connecting rod length of 150mm, a reciprocating mass of 3kg and its firing order is 1-3-4-2. the spacing between cylinders is 100mm. i. show that the engine is in balance with regard to the primary inertia forces and primary 3. a and secondary inertia couples. li determine the out of balance secondary inertia force ii. propose ways of balancing this out of balance force and discuss the challenges that will arise
Answers: 3
question
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
question
Engineering, 04.07.2019 18:10
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
question
Engineering, 04.07.2019 18:10
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
You know the right answer?
A drainpipe 30 cm diameter lies beneath an earth dam. The pipe was partially clogged with sand. The...
Questions
question
Mathematics, 03.09.2020 01:01
question
Mathematics, 03.09.2020 01:01
question
English, 03.09.2020 01:01
Questions on the website: 13722367