subject
Engineering, 19.10.2021 23:40 bacchus6663

When performing a diode test it is necessary to: A) Connect the meter leads to each end of the diode and then reverse the leads.
B) Place the black plug on meter lead into the 10A jack
C) Connect the diode to a 12 volt battery.
D) Place the red plug on the meter lead into the 10A jack.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 03.07.2019 15:10
If you were designing a bumper for a car, would you prefer it to exhibit elastic or plastic deformation? why? consider the functions of a bumper in both a minor "fender-bender" and a major collision.
Answers: 1
question
Engineering, 03.07.2019 15:10
Heat is added to a piston-cylinder device filled with 2 kg of air to raise its temperature 400 c from an initial temperature of t1 27 cand pressure of pi 1 mpa. the process is isobaric process. find a)-the final pressure p2 b)-the heat transfer to the air.
Answers: 1
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
You know the right answer?
When performing a diode test it is necessary to: A) Connect the meter leads to each end of the dio...
Questions
Questions on the website: 13722362