PARKING LOT PANELBOARD FEEDER DEMAND LOADING:
A parking lot panelboard is supplying 62 parking stalls on 15 amp circuits which are
restricted or controlled. Determine the total calculated demand load in kW for the
FEEDER conductors supplying the panelboard.
The calculated demand load is kW
Answers: 2
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
Engineering, 03.07.2019 15:10
Heat is added to a piston-cylinder device filled with 2 kg of air to raise its temperature 400 c from an initial temperature of t1 27 cand pressure of pi 1 mpa. the process is isobaric process. find a)-the final pressure p2 b)-the heat transfer to the air.
Answers: 1
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
PARKING LOT PANELBOARD FEEDER DEMAND LOADING:
A parking lot panelboard is supplying 62 parking sta...
English, 19.02.2021 20:10
English, 19.02.2021 20:10
Physics, 19.02.2021 20:10
Mathematics, 19.02.2021 20:10
World Languages, 19.02.2021 20:10
Mathematics, 19.02.2021 20:10
Biology, 19.02.2021 20:10
Mathematics, 19.02.2021 20:10
Mathematics, 19.02.2021 20:10
History, 19.02.2021 20:10
Mathematics, 19.02.2021 20:10
Geography, 19.02.2021 20:10
Mathematics, 19.02.2021 20:10