After receiving Notice to Proceed (assume a duration of zero), the Pipe Pro project engineers will begin processing submittals for the materials to the engineers. The submittals activity should take approximately 6 days, which will give adequate time for them to be returned from the engineering team. Right after the submittals are returned, the team will take a day to order material. For the bedding material, delivery will take 5 days. For the pipe, delivery will take 14 days. Also following NTP, mobilization can start and should take approximately 4 days. After mobilization is complete, excavation of the trench can begin and will take 5 days. Following excavation and bedding material delivery, the bedding material can be placed in the trench and this will take 3 days. Then the bedding material will be compacted and this will take 3 days. Once the trench is prepped with the bedding material, the pipe can begin being laid, after it has arrived on site. It will take approximately 9 days to complete the pipe laying activity. It will then take about 3 days for the trench to be backfilled. Next, the backfill material will be compacted and you should expect this to take 2 day. Site clean-up should take about 2 days. Lastly, the engineers will inspect the site. Anticipate the final inspections will take 2 days. Finally, the terminal activity will be demobilization and this will take at least 1 day. Based on the information regarding the activities’ relationships you must create a schedule for the construction of the storm water system. Use days as the duration unit for the schedule
a. Develop a list of necessary activities and their corresponding durations. Provide this list as an accompaniment for the provided table.
b. Create an Activity on the Node Network, based on the logical relationships of the activities. Include Start and Finish activities. Provide a diagram of this network with your memo.
c. For each activity, calculate the Early Start (ES), Late Start (LS), Early Finish (EF), and Late Finish (LF).

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Refrigerant 134a enters an insulated compressor operating at steady state as saturated vapor at -26°c with a volumetric flow rate of 0.18 m3/s. refrigerant exits at 9 bar, 70°c. changes in kinetic and potential energy from inlet to exit can be ignored. determine the volumetric flow rate at the exit, in m3/s, and the compressor power, in kw.
Answers: 1
question
Engineering, 04.07.2019 18:10
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
question
Engineering, 04.07.2019 18:10
Afour cylinder four-stroke in-line engine has a stroke of 160mm, connecting rod length of 150mm, a reciprocating mass of 3kg and its firing order is 1-3-4-2. the spacing between cylinders is 100mm. i. show that the engine is in balance with regard to the primary inertia forces and primary 3. a and secondary inertia couples. li determine the out of balance secondary inertia force ii. propose ways of balancing this out of balance force and discuss the challenges that will arise
Answers: 3
question
Engineering, 04.07.2019 18:20
Air is compressed isentropically from an initial state of 300 k and 101 kpa to a final temperature of 1000 k. determine the final pressure using the following approaches: (a) approximate analysis (using properties at the average temperature) (b) exact analysis
Answers: 1
You know the right answer?
After receiving Notice to Proceed (assume a duration of zero), the Pipe Pro project engineers will b...