In the air, the amount of work done is equal to 4 If the lifting cable of a hoist lifts a 250-lb engine
times 250 lb, or 1,000 foot-pounds of work.
Select one:
O A.5
O B.2
O C.3
O D.4

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
question
Engineering, 04.07.2019 18:10
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
question
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
question
Engineering, 04.07.2019 18:10
Awall of 0.5m thickness is to be constructed from a material which has average thermal conductivity of 1.4 w/mk. the wall is to be insulated with a material having an average thermal conductivity of 0.35 w/mk so that heat loss per square meter shall not exceed 1450 w. assume inner wall surface temperature of 1200°c and outer surface temperature of the insulation to be 15°c. calculate the thickness of insulation required.
Answers: 3
You know the right answer?
In the air, the amount of work done is equal to 4 If the lifting cable of a hoist lifts a 250-lb e...
Questions
question
Physics, 21.05.2020 05:59
question
Mathematics, 21.05.2020 05:59
question
History, 21.05.2020 06:00
question
Mathematics, 21.05.2020 06:00
question
Mathematics, 21.05.2020 06:00
Questions on the website: 13722361