subject
Engineering, 31.01.2022 04:50 littledudefromacross

F(N) = 10^(N-1) minus the sum of k=1 to 10^(N) of 0.1. Work out (by hand) the exact value of f(N). Work a MATLAB function with a for loop to execute f(N). I can’t figure out how to find the exact value of this and so I can’t figure out how to format it for the for loop. I have tried and can’t find any documentation that clears it up for me. Please help.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 18:10
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
question
Engineering, 04.07.2019 19:20
A5 kg block of fe is dropped into a very large vat of water. the fe and water initial temperatures are 95 and 25 c, respectively. the fe final temperature is 25 c and the water can be treated as a thermal reservoir,. treated as a thermal reservoir take the water to be the system and determine the entropy generation. report vour answer in kj/k.
Answers: 1
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
F(N) = 10^(N-1) minus the sum of k=1 to 10^(N) of 0.1. Work out (by hand) the exact value of f(N). W...
Questions
question
Biology, 04.10.2021 08:00
question
Mathematics, 04.10.2021 08:00
question
Mathematics, 04.10.2021 08:00
question
Mathematics, 04.10.2021 08:00
question
English, 04.10.2021 08:00
question
Mathematics, 04.10.2021 08:00
Questions on the website: 13722363