Engineering, 18.02.2022 07:30 thebrain1345

Why might construction crews want to install pipes before the foundation is poured? Plumbing crews are more expensive than concrete masons; therefore it is cheaper if they do their work first.
Plumbing crews are more expensive than concrete masons; therefore it is cheaper if they do their work first.

Pipes form an important component of the structural integrity of a foundation.
Pipes form an important component of the structural integrity of a foundation.

Plumbing must feed into municipal water and sewer lines buried below the foundation.
Plumbing must feed into municipal water and sewer lines buried below the foundation.

All utilities, including electrical and HVAC, are installed before the foundation is laid.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 18:10
Ajournal bearing has a journal diameter of 3.250 in with a unilateral tolerance of 20.003 in. the bushing bore has a diameter of 3.256 in and a unilateral tolerance of 0.004 in. the bushing is 2.8 in long and supports a 700-lbf load. the journal speed is 900 rev/min. find the minimum oil film thickness and the maximum film pressure for both sae 20 and sae 20w-30 lubricants, for the tightest assembly if the operating film temperature is 160°f. a computer code is appropriate for solving this problem.
Answers: 3
question
Engineering, 04.07.2019 18:10
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
question
Engineering, 04.07.2019 18:10
Ahot wire operates at a temperature of 200°c while the air temperature is 20°c. the hot wire element is a tungsten wire of 5 um diameter and 2 mm in length. plot using excel current, heat transfer and heat generated by the wire for air velocity varying from 1-10 m/s in steps of lm/s? matlab the sensor voltage output, resistance, or assume nu 0.989 re033pr13 take air properties at tr (200°c20°c)/2 = 110°c properties of tungsten: c 0.13 kj/kg.k 3 p 19250 kg/m k (thermal conductivity) = 174 w/m.k
Answers: 2
You know the right answer?
Why might construction crews want to install pipes before the foundation is poured? Plumbing crews...
Questions
question
Computers and Technology, 13.08.2021 14:00
question
Mathematics, 13.08.2021 14:00
question
English, 13.08.2021 14:00
question
World Languages, 13.08.2021 14:00
question
Mathematics, 13.08.2021 14:00
question
Mathematics, 13.08.2021 14:00
Questions on the website: 13722363