Engineering, 20.02.2022 23:00 marquetter7689

PEMEX, Mexico’s petroleum corporation, has an estimated budget for oil and gas exploration that includes equipment for three offshore platforms as shown. Use PW analysis to select the best alternative at a MARR of 15% per year. Select platform X, Y, or Z using (a) tabulated factors, and (b) single-cell spreadsheet functions, as instructed. Table Summary: Table divided into 4 columns with the headings marked from left to right as: Platform; X; Y; and Z. Platform X Y Z First cost, $ million −300 −450 −510 M&O, $ million per year −320 −290 −230 Salvage value, $ million 75 50 90 Estimated life, years 20 20 20

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:10
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
question
Engineering, 04.07.2019 18:10
Different types of steels contain different elements that alter the characteristics of the steel. for each of the following elements, explain what the element does when alloyed with steel.
Answers: 2
question
Engineering, 04.07.2019 18:20
Amixture of slurry and mud is to be pumped through a horizontal pipe of diameter 500 mm. the fluid behaves as a bingham plastic with a yield stress of 30 pa and viscosity 0.04 pa.s. describe the effects of the shear stress through a transverse section of the pipe by plotting the variation in shear stress and velocity profile: (i) just before the slurry starts to move (ii) as the slurry flows when the pressure gradient is double that in part (i)
Answers: 3
You know the right answer?
PEMEX, Mexico’s petroleum corporation, has an estimated budget for oil and gas exploration that incl...
Questions
question
Mathematics, 06.03.2020 08:01
question
Mathematics, 06.03.2020 08:01
question
Health, 06.03.2020 08:02
question
Mathematics, 06.03.2020 08:02
Questions on the website: 13722360