During an inspection, it was found that data racks were not properly grounded. to pass the
inspection and address a growing concern to protect data cabling and equipment, a technician
must make sure all racks are properly grounded.
which of the following tools should the technician use to verify this has been completed?
a. multimeter
b. cable tester
c. tone generator
d. voltmeter

ansver
Answers: 3

Another question on English

question
English, 22.06.2019 02:30
Which passage is an example of rising action in edgar allan poe`s "the black cat
Answers: 3
question
English, 22.06.2019 03:00
Before odysseus talks about the lotus-eaters and the cyclops, what other events does he refer to? a. the advances of suitors that his wife penelope must fend off b. the attack by poseidon on his ship c. the attack and raid on the land of the cicones d. the nights he spent inside the trojan horse
Answers: 1
question
English, 22.06.2019 03:00
Hey guys..what is the meanings of these word : 1 mazdoori2 rozznamccheplz answer fast
Answers: 2
question
English, 22.06.2019 07:00
How is theme of loneliness developed in chapter 4? thinking about the characters lennie,crooks,candy,and curley's wife
Answers: 1
You know the right answer?
During an inspection, it was found that data racks were not properly grounded. to pass the
ins...
Questions
question
English, 15.08.2021 20:00
question
Mathematics, 15.08.2021 20:00
Questions on the website: 13722367