subject
Health, 07.05.2020 06:04 idk9329

The average number of transcribed lines per month at Bent Tree Hospital is 142,500. The daily production standard is 950 lines per day. With 20 workdays in the month, calculate the minimum number of FTEs needed for this volume.

A. 13B. 8C. 6D. 7.5

ansver
Answers: 3

Another question on Health

question
Health, 22.06.2019 02:00
Astudy shows that an influenza vaccine is 71.4% effective in preventing a particular type of influenza. if 15,422 people receive the vaccine, how many would not be protected and would be likely to get infulenza?
Answers: 1
question
Health, 22.06.2019 15:00
How will health most likely be affected if you follow the recommended guidelines for sleep rest and physical activity
Answers: 1
question
Health, 23.06.2019 02:00
Max is a child with special needs. what is the best way his family can support max? a. place max in an institution that looks after such children b. limit his exposure to the outside world c. provide max with as normal a childhood as possible d. prevent max from mixing with other children with special needs
Answers: 2
question
Health, 24.06.2019 02:10
Emily is a college freshmen with anorexia nervosa whose weight has been dropping to dangerous, even life-threatening levels. the treatment that emily needs is . 1) cognitive behavioral 2) behavioral 3) interpersonal therapy 4) hospitalization
Answers: 3
You know the right answer?
The average number of transcribed lines per month at Bent Tree Hospital is 142,500. The daily produc...
Questions
question
Business, 04.12.2019 09:31
Questions on the website: 13722361