subject
Mathematics, 20.07.2019 12:00 eliezer25

Each type a machine fills 400 cans per minute, each type b machine fills 600 cans per minute, and each type c machine installs 2,400 lids per minute. a lid is installed on each can that is filled and on no can that is not filled. for a particular minute, what is the total number of machines working?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
Quick translate "x is 12 units from 20" into an equation. what are the values of x being described? if you can answer any of my other questions that'd be great too
Answers: 2
question
Mathematics, 21.06.2019 16:30
Which composition of similarity transformations maps polygon abcd to polygon a'b'c'd'? a dilation with a scale factor less than 1 and then a reflection a dilation with a scale factor less than 1 and then a translation a dilation with a scale factor greater than 1 and then a reflection a dilation with a scale factor greater than 1 and then a translation
Answers: 3
question
Mathematics, 21.06.2019 17:30
For each proportion find the unknown number x 1/5/8=×/15
Answers: 1
question
Mathematics, 21.06.2019 18:30
What describes horizontal cross section of the right rectangle 6m 8m 5m
Answers: 1
You know the right answer?
Each type a machine fills 400 cans per minute, each type b machine fills 600 cans per minute, and ea...
Questions
Questions on the website: 13722367