subject
Mathematics, 14.07.2019 01:00 ciarrap552

The eastern alberta dc transmission line is a project that began construction in 2012. it includes a 500km, 500kv power line from the brooks area to the edmonton area. (the v stands for "volts", an si unit for electrical potential.)a. suppose the towers supporting the line are 1.5 hm apart. how many towers would be required to complete the project? b. a rechargeable aa battery produces approximately 1.2 volts. how many times larger is the voltage in the power line than that of the battery?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
Football player weighed 170 2/3 pounds in may. during the summer he gained 25 5/12 pounds. during the first week of fall practice he lost 10 1/4 pounds and during the second week he lost another 3 1/2 ponds. how much does he weigh at this point? a.182 1/3ib b.181 1/2ib c.182 5/12ib d.183 2/3ib
Answers: 1
question
Mathematics, 21.06.2019 18:40
Which of the following would be a good name for the function that takes the weight of a box and returns the energy needed to lift it?
Answers: 1
question
Mathematics, 21.06.2019 19:40
Which of the following three dimensional figures has a circle as it’s base
Answers: 2
question
Mathematics, 21.06.2019 20:00
Which type of graph would allow us to quickly see how many students between 100 and 200 students were treated?
Answers: 1
You know the right answer?
The eastern alberta dc transmission line is a project that began construction in 2012. it includes a...
Questions
question
Biology, 30.11.2021 09:30
question
English, 30.11.2021 09:30
question
Mathematics, 30.11.2021 09:30
question
Mathematics, 30.11.2021 09:30
question
Biology, 30.11.2021 09:30
question
Chemistry, 30.11.2021 09:30
question
English, 30.11.2021 09:30
Questions on the website: 13722361