Mathematics, 18.12.2019 11:31 kenleighbrooke67

On a new construction site, an electrician can install a new light fixture in 20 minutes. a project calls for 24 new fixtures to be installed on each of 4 floors. if a work day is 8 hours, how many work days will it take two electricians to complete the installations?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
The sum of two numbers is 12 and their difference is 18 what are the two numbers
Answers: 1
question
Mathematics, 21.06.2019 22:00
15 points what is the end behavior of this graph? & what is the asymptote of this graph?
Answers: 1
question
Mathematics, 21.06.2019 22:00
(01.04 lc)multiply 1 over 6 multiplied by negative 1 over 2. negative 1 over 3 negative 1 over 12 1 over 12 1 over 3
Answers: 1
question
Mathematics, 22.06.2019 00:30
The base of the rectangle pyramid is 13 inches long and 12 inches wide the height of the pyramid is 18 inches . what is the volume of the pyramid ?
Answers: 2
You know the right answer?
On a new construction site, an electrician can install a new light fixture in 20 minutes. a project...