It takes 14 electricians 18 days to wire a new housing subdivision. how many days would it take 24 electricians to do the same job?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 19:30
Complete the solution of the equation. find the value of y when x equals to 28 x+3y=28
Answers: 2
question
Mathematics, 22.06.2019 03:00
Abilliard ball is struck by a cue. it travels 1 0 0 cm 100cm before ricocheting off a rail and traveling another 1 2 0 cm 120cm into a corner pocket. the angle between the path as the ball approaches the rail and the path after it strikes the rail is 4 5 ∘ 45 ∘ . how far is the corner pocket from where the cue initially struck the ball? do not round during your calculations. round your final answer to the nearest centimeter.
Answers: 1
question
Mathematics, 22.06.2019 04:00
Sarah needs 3 feet of fabric for a project she is working on, but the store only sells the fabric in meters. one meter of fabric costs $1.20. how much will the fabric cost?
Answers: 2
question
Mathematics, 22.06.2019 05:20
Drag each tile to the correct box. not all tiles will be used. arrange the steps to solve the equation . simplify to obtain the final radical term on one side of the equation. raise both sides of the equation to the power of 2. apply the zero product rule. use the quadratic formula to find the values of x. simplify to get a quadratic equation. raise both sides of the equation to the power of 2 again.
Answers: 1
You know the right answer?
It takes 14 electricians 18 days to wire a new housing subdivision. how many days would it take 24 e...
Questions
question
Mathematics, 04.03.2021 21:00
question
Engineering, 04.03.2021 21:00
question
Mathematics, 04.03.2021 21:00
Questions on the website: 13722361