subject
Mathematics, 01.02.2020 15:46 stephstewart1209

In a bolt factory, machines 1,2, and 3 respectively produce 20%, 30% and 50% of the total output. of their respective outputs 5%, 3%, and 2% are defective. a bolt is selected at random.
a. what is the probability that is defective?
b. given that is defective, what is the probability that it was made by machine 1?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:10
An unknown number of kids and buses are getting assigned. when assigning 4 kids to each bus, there are 2 kids that aren't placed in a bus. when assigning 8 kids to each bus, there are 2 empty buses. how many total kids are there?
Answers: 1
question
Mathematics, 21.06.2019 19:30
If the ratio of sum of the first m and n terms of an ap is m2 : n2 , show that the ratio of its mth and nth terms is (2m − 1) : (2n − 1).
Answers: 3
question
Mathematics, 21.06.2019 21:30
Apool measures 100 meters by 100 meters a toddler inside the pool and trows a ball 60 centimeters from one edge of the pool.how far is the ball from the opposite edge of the pool
Answers: 1
question
Mathematics, 21.06.2019 22:00
Given that sin∅ = 1/4, 0 < ∅ < π/2, what is the exact value of cos∅? a. (√4)/4 b. (√15)/4 c. (4π)/2 d. (4√2)/4
Answers: 2
You know the right answer?
In a bolt factory, machines 1,2, and 3 respectively produce 20%, 30% and 50% of the total output. of...
Questions
question
Geography, 31.05.2020 21:59
Questions on the website: 13722367