Mathematics, 03.02.2020 21:48 andrearamos12oxdie5
Acommercial contractor needs to clear a plot of land for a new bank. ryan can clear the lot in 7.5 hr. ethan can do the same job in 10.5 hr. how long will it take them, working together, to clear the land ?
Answers: 2
Mathematics, 21.06.2019 12:40
Aparallelogram has two side lengths of 5 units. three of its sides have equations y = 0, y = 2, y = 2x. find the equation of the fourth side.
Answers: 1
Mathematics, 21.06.2019 17:30
During a bike challenge riders have to collect various colored ribbons each 1/2 mile they collect a red ribbon each eighth mile they collect a green ribbon and each quarter mile they collect a blue ribbion wich colors of ribion will be collected at the 3/4 markrer
Answers: 3
Mathematics, 21.06.2019 18:30
The height of a flare fired from the deck of a ship in distress can be modeled by h(t)= -2(8t^2-52t-28), where h is the height of the flare above water and t is the time in seconds. a. find the time it takes the flare to hit the water.
Answers: 1
Mathematics, 21.06.2019 19:00
Arestaurant chef made 1 1/2 jars of pasta sauce. each serving of pasta requires 1/2 of a jar of sauce. how many servings of pasta will the chef be bale to prepare using the sauce?
Answers: 3
Acommercial contractor needs to clear a plot of land for a new bank. ryan can clear the lot in 7.5 h...
English, 07.10.2019 02:00
English, 07.10.2019 02:00
History, 07.10.2019 02:00
History, 07.10.2019 02:00
History, 07.10.2019 02:00
Biology, 07.10.2019 02:00
Mathematics, 07.10.2019 02:10
Mathematics, 07.10.2019 02:10