subject
Mathematics, 14.10.2019 00:00 ValeryGi3721

Provided below are summary statistics for independent simple random samples from two populations. use the nonpooled t-test and the nonpooled t-interval procedure to conduct the required hypothesis test and obtain the specified confidence interval. x overbar 1equals11, s 1equals3, n 1equals25, x overbar 2equals10, s 2equals8, n 2equals20 a. right-tailed test, alphaequals0.05 b. 90% confidence interval a. what are the hypotheses for the t-test? a. h0: mu1equalsmu2 ha: mu1not equalsmu2 b. h0: mu1equalsmu2 ha: mu1greater thanmu2 your answer is correct. c. h0: mu1equalsmu2 ha: mu1less thanmu2 d. h0: mu1greater than or equalsmu2 ha: mu1less thanmu2 find the test statistic. tequals . 530 (round to three decimal places as needed.) find the p-value. pequals . 3006 (round to four decimal places as needed.) what is the conclusion of the hypothesis test? a. reject h0. there is insufficient evidence that mu1 is greater than mu2. b. do not reject h0. there is sufficient evidence that mu1 is greater than mu2. your answer is not correct. c. do not reject h0. there is insufficient evidence that mu1 is greater than mu2. this is the correct answer. d. reject h0. there is sufficient evidence that mu1 is greater than mu2. b. the 90% confidence interval is from nothing to nothing. (round to three decimal places as needed.)

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 19:30
Order the measurements from the least to the greatest. 2,720 ml , 24.91 l , 0.0268 kl
Answers: 1
question
Mathematics, 21.06.2019 21:00
Val and tony get paid per project. val is paid a project fee of $44 plus $12 per hour. tony is paid a project fee of $35 plus $15 per hour. write an expression to represent how much a company will pay to hire both to work the same number of hours on a project.
Answers: 1
question
Mathematics, 21.06.2019 21:10
Which question is not a good survey question? a.don't you agree that the financial crisis is essentially over? 63on average, how many hours do you sleep per day? c. what is your opinion of educational funding this year? d.are you happy with the availability of electronic products in your state?
Answers: 2
question
Mathematics, 21.06.2019 23:50
4. (10.03 mc) the equation of line cd is y = −2x − 2. write an equation of a line parallel to line cd in slope-intercept form that contains point (4, 5). (4 points) y = −2x + 13 y = negative 1 over 2 x + 7 y = negative 1 over 2 x + 3 − 2x − 3
Answers: 2
You know the right answer?
Provided below are summary statistics for independent simple random samples from two populations. us...
Questions
question
Mathematics, 02.11.2020 04:10
question
Mathematics, 02.11.2020 04:10
question
Mathematics, 02.11.2020 04:10
question
Mathematics, 02.11.2020 04:10
Questions on the website: 13722362