Mathematics, 21.11.2019 23:31 hectorgonzalejr333
Two groups of workers are painting a bridge in the bay. the first group is responsible for painting the north side of the bridge, and the second group is responsible for painting the south side of the bridge. the first group has already painted 2 kilometers of the bridge and is painting 2 additional kilometers per day. the second group has already painted 5 kilometers of the bridge and is painting 1 additional kilometer per day. when the two groups have painted the same amount of the bridge, how much of the bridge will they each have painted?
Answers: 3
Mathematics, 21.06.2019 15:00
Answer soon(fast) 15 pts-brainliest? for right answer with small explination a restaurant catered a party for 40 people. a child’s dinner (c) cost $11 and an adult’s dinner (a) cost $20. the total cost of the dinner was $728. how many children and adults were at the party? use the table to guess and check.(i couldn't get the graph onto the question) 8 children and 32 adults9 children and 31 adults10 children and 30 adults12 children and 28 adults
Answers: 1
Mathematics, 22.06.2019 00:00
The construction of copying qpr is started below. the next step is to set the width of the compass to the length of ab. how does this step ensure that a new angle will be congruent to the original angle? by using compass take the measures of angle and draw the same arc according to it.
Answers: 1
Mathematics, 22.06.2019 02:30
Find the area of the region between a regular hexagon with sides of 6" and its inscribed circle.
Answers: 1
Two groups of workers are painting a bridge in the bay. the first group is responsible for painting...
English, 01.09.2021 19:20
Mathematics, 01.09.2021 19:20
Mathematics, 01.09.2021 19:20
Mathematics, 01.09.2021 19:20
Computers and Technology, 01.09.2021 19:20
Health, 01.09.2021 19:20
Mathematics, 01.09.2021 19:20
Mathematics, 01.09.2021 19:20
Mathematics, 01.09.2021 19:20
English, 01.09.2021 19:20
Mathematics, 01.09.2021 19:20
Mathematics, 01.09.2021 19:20