subject
Mathematics, 30.06.2019 04:00 mrmendrala

Pipeline constructed of carbon steel failed after 3 years of operation. on examination it was found that the wall thickness had been reduced by corrosion to about half the original value. the pipeline was constructed of nominal 100 mm (4 in) schedule 40, pipe, inside diameter 102.3 mm (4.026 in), outside diameter 114.3 mm (4.5 in). estimate the rate of corrosion in ipy (inches per year) and mm per year.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
D(5, 7). e(4,3), and f(8, 2) form the vertices of a triangle. what is mzdef? oa. 30° ob. 45° oc. 60° od 90°
Answers: 1
question
Mathematics, 21.06.2019 19:00
Solve x+3y=6 and 4x-6y=6 by elimination . show work !
Answers: 1
question
Mathematics, 21.06.2019 19:40
Graph y = -|x| + 2. click on the graph until the correct one appears.
Answers: 3
question
Mathematics, 21.06.2019 19:50
Organic apples are on special for $1.50 per pound. does total cost vary inversely or directly with the number of pounds purchased? find the cost of 3.4 pounds of apples. a. inversely: $5.10 b. directly; $5.10 c. inversely: $2.27 d. directly; $2.27
Answers: 1
You know the right answer?
Pipeline constructed of carbon steel failed after 3 years of operation. on examination it was found...
Questions
question
Computers and Technology, 23.09.2019 15:50
question
History, 23.09.2019 15:50
question
Geography, 23.09.2019 15:50
question
Business, 23.09.2019 15:50
Questions on the website: 13722361