Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? the standard normal equation can be applied as follows: z = startfraction left parenthesis due date minus expected date of completion right parenthesis over sigma subscript p endfraction , where z is the number of standard deviations the due date or target date lies from the mean or expected date and sigma subscript p is the project standard deviation, which is the square root of the variance. for the due date of 17 months, value of z based on the given information = negative 2.000 (round your response to two decimal places). using the standard normal table , the probability that the project will be completed in 17 months = nothing (round your response to four decimal places).

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 22:00
(01.04 lc)multiply 1 over 6 multiplied by negative 1 over 2. negative 1 over 3 negative 1 over 12 1 over 12 1 over 3
Answers: 1
question
Mathematics, 21.06.2019 23:30
For the feasibility region shown below find the maximum value of the function p=3x+2y
Answers: 3
question
Mathematics, 22.06.2019 01:00
Sanderson is having trouble with his assignment. his shown work is as follows: − 3 7 7 3 = − 3 7 × 7 3 = − 21 21 = −1 however, his answer does not match the answer that his teacher gives him. complete the description of sanderson's mistake. find the correct answer.
Answers: 3
question
Mathematics, 22.06.2019 02:10
Which option identifies how kevin should proceed in the following scenario? four years ago kevin designed an mp3 player for young children. now that technology has changed, he would like to update his design to ensure that it encompasses cutting-edge techniques. by creating a third-angle projection of his ideas by designing an isometric projection of his new ideas by referring to past designs and illustrations of his original model by conferring with engineers who have improved upon similar devices
Answers: 3
You know the right answer?
Using pert, adam munson was able to determine that the expected project completion time for the cons...
Questions
question
Computers and Technology, 26.07.2019 03:00
Questions on the website: 13722359