subject
Mathematics, 24.06.2019 22:50 carvarceuanmoss

Lockheed martin, the defense contractor designs and build communication satellite systems to be used by the u. s. military. because of the very high cost the company performs numerous test on every component. these test tend to extend the component assembly time. suppose the time required to construct and test (called build time) a particular component is thought to be normally distributed, with a mean equal to 45 hours and a standard deviation equal to 6.75 hours. to keep the assembly flow moving on schedule, this component needs to have a build time between 37.5 and 54 hours. find the propability that the bulid time will be such that assembly will stay on schedule.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Look at attachment. has all info needed. need
Answers: 1
question
Mathematics, 21.06.2019 17:20
Consider the proof. given: segment ab is parallel to line de. prove: what is the missing statement in step 5?
Answers: 3
question
Mathematics, 21.06.2019 18:00
Adriveway is 40 yards long about how many meters long is it
Answers: 2
question
Mathematics, 21.06.2019 18:50
Standard deviation of 19,29,21,22,23
Answers: 1
You know the right answer?
Lockheed martin, the defense contractor designs and build communication satellite systems to be used...
Questions
question
English, 15.07.2021 17:10
question
History, 15.07.2021 17:10
question
Mathematics, 15.07.2021 17:10
question
Mathematics, 15.07.2021 17:10
Questions on the website: 13722361