subject
Mathematics, 25.06.2019 06:40 batmanmarie2004

Amanual assembly line must be designed for a product with annual demand of 150,000 units. the line will operate 50 wk/yr, 10 shifts/wk, and 7.5 hr/shift. work units will be attached to a continuously moving conveyor. work content time is 58.0 min. assume line efficiency is 0.95, balancing efficiency is 0.93, and repositioning time is 8 sec. determine the actual number of workers required.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
Which expression is equivalent to 2x^2+7x+4?
Answers: 3
question
Mathematics, 21.06.2019 15:20
Use the x-intercept method to find all real solutions of the equation. -9x^3-7x^2-96x+36=3x^3+x^2-3x+8
Answers: 1
question
Mathematics, 21.06.2019 19:30
If (17, 4) is an ordered pair of the inverse of f(x), which of the following is an ordered pair of the function f(x)? a. (17,4) b. (4.17) c. (4,0) d. 0,17)
Answers: 2
question
Mathematics, 21.06.2019 20:30
What is 140% of 25? because i need
Answers: 2
You know the right answer?
Amanual assembly line must be designed for a product with annual demand of 150,000 units. the line w...
Questions
question
Mathematics, 09.02.2021 18:00
question
Mathematics, 09.02.2021 18:00
question
Spanish, 09.02.2021 18:00
question
Mathematics, 09.02.2021 18:00
question
Geography, 09.02.2021 18:00
Questions on the website: 13722359