subject
Mathematics, 01.07.2019 21:30 Jamuel3761

The auto repair shop of quality motor company uses standards to control the labor time and labor cost in the shop. the standard labor cost for a motor tune-up is given below: standard hours standard rate standard cost motor tune-up 1.80 $5.50 $9.90 the record showing the time spent in the shop last week on motor tune-ups has been misplaced. however, the shop supervisor recalls that 170 tune-ups were completed during the week, and the controller recalls the following variance data relating to tune-ups: labor rate variance $ 517 f labor spending variance $ 385 u required: 1. determine the number of actual labor-hours spent on tune-ups during the week. 2. determine the actual hourly rate of pay for tune-ups last week. (round your answer to 2 decimal places.)

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
Aquadratic function f(x) has a turning point at (3,-7). what is the turning point of -f(x)?
Answers: 1
question
Mathematics, 21.06.2019 18:00
What is the equation of this graphed line? enter your answer in slope-intercept form in the box.
Answers: 2
question
Mathematics, 21.06.2019 21:30
Amachine part consists of a half sphere and a cylinder, as shown in the figure. the total volume of the part is π cubic inches.
Answers: 1
question
Mathematics, 21.06.2019 23:00
During a wright loss challenge your friend goes from 125 pounds to 100 pounds.what was the percent weight loss
Answers: 2
You know the right answer?
The auto repair shop of quality motor company uses standards to control the labor time and labor cos...
Questions
question
Chemistry, 04.07.2019 06:30
Questions on the website: 13722367