subject
Mathematics, 12.07.2019 21:30 jacob7542

Amanufacturing company produces two models of entertainment centers. model a requires 9 feet of molding and takes 2 hours to manufacture. model b needs 16 feet of molding and 4 hours to manufacture. in a given? week, the company has 134 hours of labor and 555 feet of molding available. solve the system and draw a graph of the solution set.
__ < or equal to 555
__ < or equal to 134

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
Adice is rolled 5 times. how many possible rolls are there? ( determine the number of outcomes using only the fundamental counting principal )
Answers: 1
question
Mathematics, 22.06.2019 00:30
Roy has 4 1/2 pizzas for the soccer team to split after the game. if each member is going to get 1/2 of a pizza, how many players are on the soccer team
Answers: 1
question
Mathematics, 22.06.2019 01:30
20 points for the answer. this is for real , don't put random ! a rectangle has a length of 4 centimeters and a width of 7 centimeters. what is the effect on the perimeter when the dimensions are multiplied by 5? the perimeter is increased by a factor of 5. the perimeter is increased by a factor of 20. the perimeter is increased by a factor of 25. the perimeter is increased by a factor of 100.
Answers: 2
question
Mathematics, 22.06.2019 02:00
Rewrite the expression in z to the n power. the expression i was given is: 1 over z to the negative 1 half power.
Answers: 2
You know the right answer?
Amanufacturing company produces two models of entertainment centers. model a requires 9 feet of mold...
Questions
question
Social Studies, 01.09.2019 06:30
question
English, 01.09.2019 06:30
question
Mathematics, 01.09.2019 06:30
Questions on the website: 13722367