Using the following project information, calculate the expected time for each of the project activities. activity optimistic time estimate(weeks) most likely time estimates (weeks) pessimistic time estimates (weeks) immediate predecessor(s) a 3 7 11 none b 4 4 7 a c 4 8 14 a d 3 7 12 b e 5 9 17 c f 3 4 6 d, e g 4 6 10 d, e h 5 5 12 f i 4 9 11 g j 3 3 3 h, i

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
The table below shows the height of a ball  x  seconds after being kicked.  what values, rounded to the nearest whole number, complete the quadratic regression equation that models the data? f(x)  =  x2  +  x  +  0based on the regression equation and rounded to the nearest whole number, what is the estimated height after 0.25 seconds?   feet
Answers: 2
question
Mathematics, 21.06.2019 20:00
Put the equation in slope intercept form by solving for y
Answers: 2
question
Mathematics, 21.06.2019 21:00
Which spreadsheet would be used to compute the first nine terms of the geometric sequence a^n=32•(1/2)n-1
Answers: 3
question
Mathematics, 21.06.2019 22:50
Type the correct answer in the box. use numerals instead of words. if necessary, use / for the fraction bar.
Answers: 1
You know the right answer?
Using the following project information, calculate the expected time for each of the project activit...
Questions
question
Mathematics, 04.11.2019 19:31
question
History, 04.11.2019 19:31
Questions on the website: 13722361