subject
Mathematics, 03.08.2019 05:30 bcarri4073

Dunkirk consulting wishes to predict the amount of overhead expense that will be incurred by a consulting contract, to develop more accurate bids for future contracts. dunkirk has the following data on 11 completed contracts, detailing how long the project took to complete and what the exact overhead expense was: project code name project duration (days overhead expense a11 240 $29,579 a12 97 $11,871 a14 255 $34,254 a18 206 $31,928 a22 189 $21,729 b2 222 $123,822 b33 227 $117,475 b23 259 $135,083 b10 298 $150,142 b14 218 $111,374 b7 268 $141,700 using linear regression, develop a regression formula for predicting overhead expense, based on the duration of the project.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:10
What is the perimeter, p, of a rectangle that has a length of x + 8 and a width of y − 1? p = 2x + 2y + 18 p = 2x + 2y + 14 p = x + y − 9 p = x + y + 7
Answers: 3
question
Mathematics, 21.06.2019 20:30
The areas of two similar triangles are 72dm2 and 50dm2. the sum of their perimeters is 226dm. what is the perimeter of each of these triangles?
Answers: 1
question
Mathematics, 21.06.2019 22:30
What is 100,000 times 1/100,000, using the standard method of multiplication? write the answer as 10 to a power.
Answers: 1
question
Mathematics, 22.06.2019 01:00
Francis is getting new carpet tiles in his living room and den. his living room and den are connected. he needs to figure out how much carpet he needs and the cost involved. if each tile costs $2.00 per sq ft, how much would it cost to have new tile put in the den? a) $24 b) $36 c) $48 d) $54 plz awnser soon
Answers: 3
You know the right answer?
Dunkirk consulting wishes to predict the amount of overhead expense that will be incurred by a consu...
Questions
question
Mathematics, 06.05.2020 06:04
question
Mathematics, 06.05.2020 06:04
Questions on the website: 13722360