subject
Mathematics, 18.09.2019 01:00 alex43079

An apartment building is being built. each day a heating and cooling contractor installs the heating/cooling unit in 6 apartments. if there are 16 floors with 12 apartments on each floor, how long will it take the heating/cooling guys to finish the job?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 22:30
Aright triangle has an area of 21 m2. the dimensions of the triangle are increased by a scale factor of 4. what is the area of the new triangle
Answers: 3
question
Mathematics, 22.06.2019 00:00
Last week jason walked 3 1/4 miles each day for 3 days and 4 5/8 miles each day for 4 days. about how many miles did jason walk last week?
Answers: 1
question
Mathematics, 22.06.2019 00:30
Kevin has a spinner that has 10 equal sections and 2 sections of each color—red, blue, green, yellow, and purple. kevin spins the spinner 180 times. kevin determines about how many times the spinner will land on red or green, and his work is shown below. -kevin has the formula reversed; it should be the total number of sections over the number of red or green sections. -kevin should have used a 4 in the numerator because there are 2 red sections and 2 green sections. -kevin should multiply by the number of sections in the spinner rather than the total number of spins. -kevin calculated the prediction correctly and did not make any mistakes.
Answers: 1
question
Mathematics, 22.06.2019 00:40
Can you divide 25 into 4 equal groups? explain why or why not.
Answers: 1
You know the right answer?
An apartment building is being built. each day a heating and cooling contractor installs the heating...
Questions
question
English, 09.03.2021 21:10
question
SAT, 09.03.2021 21:10
question
Mathematics, 09.03.2021 21:10
question
English, 09.03.2021 21:10
question
Mathematics, 09.03.2021 21:10
Questions on the website: 13722362