subject
Mathematics, 18.09.2019 04:10 halohero7

One of the assumptions underlying the theory of control charting is that successive plotted points are independent of one another. each plotted point can signal either that a manufacturing process is operating correctly or that there is some sort of malfunction. even when a process is running correctly, there is a small probability that a particular point will signal a problem with the process. suppose that this probability is 0.07. what is the probability that at least one of 10 successive points indicates a problem when in fact the process is operating correctly? (round your answer to three decimal places.)

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
The contents of 3838 cans of coke have a mean of x¯¯¯=12.15x¯=12.15. assume the contents of cans of coke have a normal distribution with standard deviation of σ=0.12.σ=0.12. find the value of the test statistic zz for the claim that the population mean is μ=12.μ=12.
Answers: 1
question
Mathematics, 21.06.2019 16:00
What is the measure of angle afe? 79 81 91 99
Answers: 3
question
Mathematics, 21.06.2019 19:00
Solve 3x-18=2y and 5x-6y=14 by elimination or substitution . show all !
Answers: 1
question
Mathematics, 22.06.2019 00:30
Given sin28.4=.4756, cos28.4=.8796, and tan28.4=.5407 find the cot of 61.6
Answers: 1
You know the right answer?
One of the assumptions underlying the theory of control charting is that successive plotted points a...
Questions
question
History, 05.10.2019 12:30
Questions on the website: 13722361