Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 21.06.2019 22:00
The numbers on a football field indicate 10 yard increments. you walk around the perimeter of a football field between the pylons. you walk a distance of 30623 yards. find the area and perimeter of the indicated regions. write your answers as mixed numbers, if necessary. a. one end zone: perimeter: yd area: yd2 b. the playing field (not including end zones): perimeter: yd area: yd2 c. the playing field (including end zones): perimeter: yd area: yd2
Answers: 1
Mathematics, 21.06.2019 22:00
Luke started a weight-loss program. the first week, he lost x pounds. the second week, he lost pounds less than times the pounds he lost the first week. the third week, he lost 1 pound more than of the pounds he lost the first week. liam started a weight-loss program when luke did. the first week, he lost 1 pound less than times the pounds luke lost the first week. the second week, he lost 4 pounds less than times the pounds luke lost the first week. the third week, he lost pound more than times the pounds luke lost the first week.
Answers: 2
Mathematics, 21.06.2019 23:30
Which choice has the correct steps in graphing the solution set to the following inequality? -45_> 20x-5y
Answers: 1
14 to 21= to 15 me find the ratio...
Spanish, 28.01.2021 21:00
Mathematics, 28.01.2021 21:00
Social Studies, 28.01.2021 21:00
Chemistry, 28.01.2021 21:00
English, 28.01.2021 21:00
Physics, 28.01.2021 21:00
Biology, 28.01.2021 21:00