Mathematics, 09.10.2019 23:10 bree6754

The time for an operator to complete a task is normally distributed with a mean of 9.5 minutes and a standard deviation of 0.6 minutes. the production order for the day requires this task be completed 47 times. a) determine the probability distribution for the total time to complete all 47 tasks. give the name of the distribution and its parameter(s). b) the production manager has promised this job will be complete at the end of the day. what is the probability the operator does not complete all 47 tasks by the end of the day? assume a work day is 7.5 hours accounting for breaks. c) the operations manager disagrees with the production manager. she believes the time to complete the task is better modeled with the 2-parameter weibull distribution with  = 111.5 and  = 449.2 mins. now what is the probability the operator does not complete all 47 tasks by the end of the day?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
Because of your favorite lemonade it is $3.84 for 3 gallons. write this as an unit rate
Answers: 2
question
Mathematics, 21.06.2019 22:00
If abcde is reflected over the x-axis and then translated 3 units left, what are the new coordinates d? are he re
Answers: 1
question
Mathematics, 21.06.2019 23:00
Look at the chart showing the results of a baseball player at bat. which is the probability of getting a hit?
Answers: 1
question
Mathematics, 21.06.2019 23:20
For which pairs of functions is (f•g)(x)=12x? f(x)=3-4x and g(x)=16x-3 f(x)=6x2 and g(x)= 2/x f(x)= and g(x) = 144x f(x)=4x and g(x) =3x
Answers: 1
You know the right answer?
The time for an operator to complete a task is normally distributed with a mean of 9.5 minutes and a...
Questions
question
World Languages, 30.06.2019 09:00
question
Mathematics, 30.06.2019 09:00
question
Biology, 30.06.2019 09:00
question
Mathematics, 30.06.2019 09:00
Questions on the website: 13722361