Mathematics, 12.10.2019 04:20 coolman5999alt
Workers at a factory produce a toy with a defect about once every 4 hours on average. each toy costs the factory approximately $7 in labor and supplies.
c) what is the expected cost to the factory for toys with defects at the end of a 40-hour work week?
Answers: 1
Mathematics, 21.06.2019 19:40
Afactory makes propeller drive shafts for ships. a quality assurance engineer at the factory needs to estimate the true mean length of the shafts. she randomly selects four drive shafts made at the factory, measures their lengths, and finds their sample mean to be 1000 mm. the lengths are known to follow a normal distribution whose standard deviation is 2 mm. calculate a 95% confidence interval for the true mean length of the shafts. input your answers for the margin of error, lower bound, and upper bound.
Answers: 3
Mathematics, 21.06.2019 20:00
15 there is a line that includes the point 0,10 and has a slope of 7/4. what is it’s equation in slope intercept form
Answers: 1
Mathematics, 22.06.2019 01:30
Which term describes the point where the perpendicular bisectors of the three sides of a triangle intersect?
Answers: 3
Workers at a factory produce a toy with a defect about once every 4 hours on average. each toy costs...
Biology, 15.08.2021 18:10
Computers and Technology, 15.08.2021 18:10
Mathematics, 15.08.2021 18:10
English, 15.08.2021 18:10
English, 15.08.2021 18:10
English, 15.08.2021 18:10
History, 15.08.2021 18:10
World Languages, 15.08.2021 18:10
Social Studies, 15.08.2021 18:10
History, 15.08.2021 18:10
English, 15.08.2021 18:10