Mathematics, 18.10.2019 18:30 tyneshiajones124
Amanufacturing firm just received a shipment of 54 assembly parts, of slightly varied sizes, from a vendor. the manager knows that there are only 38 parts in the shipment that would be suitable. he examines these parts one at a time. a. find the probability that the first part is suitable. (round your answer to 2 decimal places.) b. if the first part is suitable, find the probability that the second part is also suitable. (round your answer to 4 decimal places.) c. if the first part is suitable, find the probability that the second part is not suitable. (round your answer to 4 decimal places.)
Answers: 3
Mathematics, 21.06.2019 14:40
Chose the graph below that represents the following system of inequality’s
Answers: 2
Mathematics, 21.06.2019 18:30
Can someone check if i did this correct. it’s number 4 if you’re wondering.
Answers: 1
Mathematics, 21.06.2019 18:30
An arc subtends a central angle measuring 7pi/4 radians what fraction of the circumference is this arc?
Answers: 1
Amanufacturing firm just received a shipment of 54 assembly parts, of slightly varied sizes, from a...
History, 31.12.2019 09:31
History, 31.12.2019 09:31
History, 31.12.2019 09:31
English, 31.12.2019 09:31
History, 31.12.2019 09:31
Mathematics, 31.12.2019 09:31
Mathematics, 31.12.2019 09:31
History, 31.12.2019 09:31
Mathematics, 31.12.2019 09:31
Biology, 31.12.2019 09:31
Social Studies, 31.12.2019 09:31
Biology, 31.12.2019 09:31
English, 31.12.2019 09:31