subject
Mathematics, 22.10.2019 01:00 jasonoliva13

All the printing presses at a print shop were scheduled to make copies of a novel and a cookbook. they were to print the same number of copies of each book, but the novel had twice as many pages as the cookbook. all of the printing presses worked for the first day on the larger book, turning out novels. then, on day two, the presses were split into two equally sized groups. the first group continued printing copies of the novel and finished printing all the copies by the evening of the second day. the second group worked on the cookbook but did not finish by evening. one printing press, working for two additional full days, finished printing the remaining copies of the cookbooks. if all printing presses printed pages (for both the novel and cookbook) at the same constant rate, how many printing presses are there at the print shop?
a. solve the problem working with rates to setup a tape diagram or an area model.
b. solve the problem by setting up an equation.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
Sienna planned a trapezoid-shaped garden, as shown in the drawing below. she decides to change the length of the top of the trapezoid-shaped garden from 32 ft to 24 ft. which expression finds the change in the scale factor?
Answers: 1
question
Mathematics, 21.06.2019 22:30
9.4.34  question   to estimate the height of a stone  figure, an observer holds a small square up to her eyes and walks backward from the figure. she stops when the bottom of the figure aligns with the bottom edge of the  square, and when the top of the figure aligns with the top edge of the square. her eye level is 1.811.81 m from the ground. she is 3.703.70 m from the figure. what is the height of the figure to the nearest hundredth of a  meter?
Answers: 1
question
Mathematics, 21.06.2019 23:00
The distance between two points is 6.5cm and scale of map is 1: 1000 what's the distance between the two points
Answers: 1
question
Mathematics, 22.06.2019 00:30
Efficient homemakers ltd. makes canvas wallets and leather wallets as part of a money-making project. for the canvas wallets, they need two yards of canvas and two yards of leather. for the leather wallets, they need four yards of leather and three yards of canvas. their production unit has purchased 44 yards of leather and 40 yards of canvas. let x be the number of leather wallets and y be the number of canvas wallets. draw the graph showing the feasible region to represent the number of the leather and canvas wallets that can be produced.
Answers: 1
You know the right answer?
All the printing presses at a print shop were scheduled to make copies of a novel and a cookbook. th...
Questions
question
English, 25.02.2021 21:10
question
Mathematics, 25.02.2021 21:10
Questions on the website: 13722367