subject
Mathematics, 02.11.2019 05:31 tblynch21

As part of the quality-control program for a catalyst manufacturing line, the raw materials (alumina and a binder) are tested for purity. the process requires that the purity of the alumina be greater than 85%. a random sample from a recent shipment of alumina yielded the following results (in percent):
93.2 87.0 92.1 90.1 87.3 93.6
a hypothesis test will be done to determine whethe or not to accept the shipment.

(a) state the appropriate null and alternate hypotheses.
(b) compute the p-value.
(c) should the shipment be accepted? explain.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
Identify which functions are linear or non-linear. a. f(x) = x2 + 1 b. f(x) = 2x + 5 c. f(x) = x 2 + 3 d. f(x) = 3 x + 7 e. f(x) = 4x + 10 2 - 5
Answers: 1
question
Mathematics, 21.06.2019 18:50
Find the greatest common factor of the followig monomials 21u^5v,3u^4v^6, and 3u^2v^5
Answers: 1
question
Mathematics, 22.06.2019 01:30
Jon’s weight loss for each week of the month is 5 lbs., 2.5 lbs., and 2.5 lbs. he gained 3.5 lbs. the last week. if jon originally weighed 198 lbs., how much does he weigh now?
Answers: 1
question
Mathematics, 22.06.2019 02:30
Adoughnut shop charges $0.50 for each doughnut and $1 for a carryout box. shirley has $10 to spend. which inequality can be used to find d, the number of doughnuts she could have bought if she also wants them in one carryout box?
Answers: 1
You know the right answer?
As part of the quality-control program for a catalyst manufacturing line, the raw materials (alumina...
Questions
question
Mathematics, 05.10.2019 12:30
question
History, 05.10.2019 12:30
Questions on the website: 13722362